Walk into the main transformer tank workshop at Nantong Zhihe Electric today, and the first impression is simple: almost every available production area is occupied.
Large transformer oil tanks are lined up at different manufacturing stages. Some have just completed structural welding, others are waiting for dimensional inspection and leak testing, while finished units are being prepared for surface treatment and delivery. The workshop is busy-but every tank still follows its own production schedule and inspection record.
Growing Demand for Custom Main Transformer Tanks
The recent increase in orders includes main transformer tanks produced according to different customer drawings and technical requirements. Unlike standardized sheet-metal products, these tanks vary considerably in dimensions, plate thickness, reinforcement structure, flange arrangement and accessory layout.
For high-voltage transformer projects, even a small dimensional error can cause difficulties during final transformer assembly. Our production team therefore reviews the drawings before fabrication and checks critical positions throughout the manufacturing process.
Connection flanges, lifting points, stiffeners, radiator mounting interfaces and tank-cover dimensions are all inspected before the tank moves to the next stage.
A Full Workshop Requires Careful Production Planning
A workshop filled with transformer tanks is a positive sign, but it also creates a practical challenge: how can multiple large projects move forward without affecting quality or delivery schedules?
Our production and project-management teams divide each order into several controlled stages:
Drawing and process review
Steel plate cutting and component preparation
Tank assembly and welding
Dimensional and appearance inspection
Air-pressure leak testing with soap water
Surface preparation and coating
Final inspection and delivery preparation
Each tank is assigned to a defined production area according to its size and planned delivery date. This allows welding, inspection and coating schedules to remain coordinated even when several projects are running at the same time.

Leak Testing Comes Before Painting
For a main transformer oil tank, leakage control is one of the most important manufacturing requirements. After welding is completed, the unpainted tank undergoes air-pressure testing. Soap water is applied to weld seams, flange joints and other critical areas to reveal even small leaks through visible bubbles.
Leak testing is performed before sandblasting and painting. If a weld requires correction, it can be repaired and retested without damaging the final coating system.
Only after the tank passes inspection does it proceed to surface treatment and painting. This sequence protects both sealing reliability and coating quality.

Busy Production, Unchanged Quality Standards
Higher order volume should never mean fewer inspections. Whether a project involves one customized tank or a batch order, every unit must pass the required dimensional, welding and leakage checks.
With a factory area of more than 100,000 square metres, robotic and manual welding capabilities, dedicated quality-control teams and an annual production capacity exceeding 30,000 tonnes, Nantong Zhihe Electric supports transformer manufacturers with both large-scale production and drawing-based customization.
Seeing the workshop filled with power transformer oil tanks gives our team a strong sense of momentum. More importantly, every tank in the workshop represents a customer project with its own technical requirements and delivery commitment.
We are busy, but we know exactly what matters: reliable welding, accurate dimensions, zero leakage and on-time delivery.
Looking for a Main Transformer Tank Manufacturer in China?
Nantong Zhihe Electric manufactures customized transformer oil tanks for power transformer projects up to 500 kV. Send us your drawings, technical specifications and required delivery schedule. Our engineering team will review the tank structure, production feasibility and quality-control requirements before quotation.
Contact us to discuss your next transformer tank project.